With the illustrative inputs below, the result is 60 sales.
Try this with your own numbersFormula and worked example
Required volume = ceiling((fixed costs + target profit) / unit contribution)
| Input | Example |
|---|---|
| Period fixed costs | 8,000 |
| Target operating profit | 4,000 |
| Revenue per production | 500 |
| Variable cost per production | 300 |
| Calculated result | 60 sales |
Choose reliable inputs
Include preparation, delivery and post-production rather than shoot or event time alone. For this video production calculation, use production schedules, vendor quotes and editing logs and a consistent definition of one production.
- Crew: include the portion belonging to this production or reporting period, and record where the value came from.
- Equipment: include the portion belonging to this production or reporting period, and record where the value came from.
- Editing: include the portion belonging to this production or reporting period, and record where the value came from.
Use the same currency for every money input. Do not mix weekly costs with monthly revenue, or count the same expense in both an itemised cost and allocated overhead.
How many sales are needed beyond break-even?
The unit contribution must be positive. Check whether delivery capacity can support the resulting volume.
What if this input changes?
If period fixed costs rises by 10%, this example changes by 4 sales. This shows the effect of one change; it does not predict what will happen.
Open the calculator, save your baseline, then change the input supported by the least reliable estimate in your records. Compare both scenarios before committing to a price or capacity promise.
