Menu
Creative & events / calculator

Video production Target Margin Quote

Find a quote that retains the chosen margin after revenue-based commission.

Cobalt ribbon, chrome ring and orange sphere in architectural light
Video production / production economics

Video production Production Quote

Your result714.285714

Delivery cost 400; allocated overhead 100; commission 35.7143; retained contribution after assigned costs 178.5714.

657.14160685.71180714.29200742.86220771.43240Crew cost
Other inputs stay fixed. Point labels show the calculated result; this is a scenario comparison.

Quote = (itemised delivery costs + allocated overhead) ÷ (1 − margin − commission)

What you’ll need

Gather production schedules, vendor quotes and editing logs. Include crew, equipment, and editing. The starting figures are examples. Replace them with your own records.

Formula and worked example

Quote = (itemised delivery costs + allocated overhead) ÷ (1 − margin − commission)

Example figures
InputExample
Crew cost200
Equipment cost150
Editing cost50
Fixed overhead allocated to this production100
Target margin after commission25 %
Selling-price commission5 %
Calculated result714.2857

Delivery cost 400; allocated overhead 100; commission 35.7143; retained contribution after assigned costs 178.5714.

Choose reliable inputs

Include preparation, delivery and post-production rather than shoot or event time alone. For this video production calculation, use production schedules, vendor quotes and editing logs and a consistent definition of one production.

  • Crew: include the portion belonging to this production or reporting period, and record where the value came from.
  • Equipment: include the portion belonging to this production or reporting period, and record where the value came from.
  • Editing: include the portion belonging to this production or reporting period, and record where the value came from.

Use the same currency for every money input. Do not mix weekly costs with monthly revenue, or count the same expense in both an itemised cost and allocated overhead.

How should commission change my quote?

Adding a commission percentage to cost does not preserve the target margin. Commission is based on the selling price.

Allocate overhead once; target margin and commission together must be below 100%.

Compare a different assumption

What if this input changes?

If crew cost rises by 10%, this example changes by 28.5714 . This shows the effect of one change; it does not predict what will happen.

Open the calculator, save your baseline, then change the input supported by the least reliable estimate in your records. Compare both scenarios before committing to a price or capacity promise.

More tools and guidance

Find the next calculation
you need.

Browse calculatorsFind your industry
Cobalt ribbon, chrome ring and orange sphere in architectural light

Search AskToBot

Start typing to find a calculator or conversion.