Remodeling contractor: Check whether you can take on more work

Allow for non-billable time, then compare available hours with the workload you expect.

Cobalt ribbon, chrome ring and orange sphere in architectural light
Remodeling contractor / remodel job economics
Check whether you can take on more work

Allow for non-billable time, then compare available hours with the workload you expect. Start with a completed job sheet, supplier quotes and a crew schedule. Each example below uses hypothetical values you can replace.

Step 01

Capacity with a Contingency Buffer

Reserve delivery capacity for variability before promising work.

Deliverable units = floor(hours × (1 − buffer) / hours per unit)

Show example inputs and result
Available delivery hours640
Hours reserved for disruption15 %
Hours per remodel job4

Result: 136 units.

The reserve is your scenario assumption; it is not a universal staffing recommendation.

Open capacity with a contingency buffer

Worked example · Input checks

Step 02

Monthly Delivery Capacity

Estimate delivery capacity from usable labour hours.

Capacity = staff × hours × utilization / hours per sale

Show example inputs and result
Delivery staff4
Available hours per staff member160
Billable utilization65 %
Hours per remodel job8

Result: 52 sales per month.

Availability, nonbillable time, and hours required per sale determine the delivery throughput.

Open monthly delivery capacity

Worked example · Input checks

Step 03

Required Delivery Staff

Estimate whole staff equivalents required for a delivery target.

Required staff = ceiling(sales × hours per sale / (hours available × utilization))

Show example inputs and result
Monthly sales target100
Labour hours per remodel job6
Available monthly hours per staff member160
Billable utilization70 %

Result: 6 staff.

The tool estimates whole staff equivalents. Part-time schedules and overtime require a separate staffing plan.

Open required delivery staff

Worked example · Input checks

Step 04

Fully Loaded Labour Cost

Convert staff cost into a delivery-hour cost for pricing.

Loaded cost = (pay + employer costs + allocated overhead) / productive hours

Show example inputs and result
Annual gross pay45,000
Employer benefits and payroll costs10,000
Allocated annual staff overhead5,000
Productive annual hours1,500

Result: 40 per productive hour.

Productive hours exclude leave, training and non-delivery time. Enter employer charges from your own payroll records.

Open fully loaded labour cost

Worked example · Input checks

Step 05

Overtime versus Extra Staff

Compare entered overtime expense with an additional staffing cost.

Overtime cost difference = extra hours × overtime rate − extra staff monthly cost

Show example inputs and result
Extra hours needed monthly80
Overtime hourly cost45
Monthly extra staff cost4,000

Result: -400 monthly cost difference.

Check actual available hours, skills, schedules, and service requirements before using a cost-only comparison.

Open overtime versus extra staff

Worked example · Input checks

Use the results in your plan

For a remodeling contractor business, review materials, subcontract costs, and scope changes across the complete workflow. Use one consistent period and delivery unit: a remodel job. Compare the assumptions with recorded outcomes after delivery, then update the estimate.

Explore all relevant remodeling contractor calculators
More tools and guidance

Find the next calculation
you need.

Browse calculatorsFind your industry
Cobalt ribbon, chrome ring and orange sphere in architectural light

Search AskToBot

Start typing to find a calculator or conversion.