In this example, increasing revenue from service a from 12,000 to 13,200 changes the result from 40 % to 43.3962 %. All other inputs stay the same.
Try this with your own numbersFormula and worked example
Combined margin = (total revenue − total variable cost) / total revenue × 100
| Input | Example |
|---|---|
| Revenue from service A | 12,000 |
| Variable cost of service A | 6,000 |
| Revenue from service B | 8,000 |
| Variable cost of service B | 6,000 |
| Calculated result | 40 % |
Choose reliable inputs
Include preparation, delivery and post-production rather than shoot or event time alone. For this photography calculation, use production schedules, vendor quotes and editing logs and a consistent definition of one session.
- Shoot time: include the portion belonging to this session or reporting period, and record where the value came from.
- Editing: include the portion belonging to this session or reporting period, and record where the value came from.
- Equipment overhead: include the portion belonging to this session or reporting period, and record where the value came from.
Use the same currency for every money input. Do not mix weekly costs with monthly revenue, or count the same expense in both an itemised cost and allocated overhead.
Can I average the two margin percentages?
Weight by revenue; a simple average gives the smaller service too much influence. Fixed overhead is excluded.
What if this input changes?
If revenue from service a rises by 10%, this example changes by 3.3962 %. This shows the effect of one change; it does not predict what will happen.
Open the calculator, save your baseline, then change the input supported by the least reliable estimate in your records. Compare both scenarios before committing to a price or capacity promise.
