Locksmith Scope Change Quote: what changes in a second scenario?

Price a separately agreed change in scope.

Cobalt ribbon, chrome ring and orange sphere in architectural light
Locksmith / callout economics
Answer

In this example, increasing extra labour hours from 6 to 6.6 changes the result from 560 to 592 . All other inputs stay the same.

Try this with your own numbers

Formula and worked example

Extra quote = (hours × hourly cost + materials + fees) / (1 − margin)

Example figures
InputExample
Extra labour hours6
Burdened labour cost per hour40
Extra materials150
Other extra cost30
Target margin25 %
Calculated result560

Choose reliable inputs

Plan materials, travel and crew time before committing to a price. For this locksmith calculation, use a completed job sheet, supplier quotes and a crew schedule and a consistent definition of one callout.

  • Hardware: include the portion belonging to this callout or reporting period, and record where the value came from.
  • Dispatch time: include the portion belonging to this callout or reporting period, and record where the value came from.
  • Travel: include the portion belonging to this callout or reporting period, and record where the value came from.

Use the same currency for every money input. Do not mix weekly costs with monthly revenue, or count the same expense in both an itemised cost and allocated overhead.

Why should extra work be priced separately?

Unpriced changes consume labour and materials without raising revenue. Record the extra scope and obtain agreement before using a quote.

This excludes contractual requirements and the original job price.

Compare a different assumption

What if this input changes?

If extra labour hours rises by 10%, this example changes by 32 . This shows the effect of one change; it does not predict what will happen.

Open the calculator, save your baseline, then change the input supported by the least reliable estimate in your records. Compare both scenarios before committing to a price or capacity promise.

More tools and guidance

Find the next calculation
you need.

Browse calculatorsFind your industry
Cobalt ribbon, chrome ring and orange sphere in architectural light

Search AskToBot

Start typing to find a calculator or conversion.