Menu
Trades & construction / Question & answer

Flooring installation Equipment Investment Payback: worked example

Estimate the simple payback of an equipment purchase.

Cobalt ribbon, chrome ring and orange sphere in architectural light
Flooring installation / flooring job economics
Answer

With the illustrative inputs below, the result is 10 months.

Try this with your own numbers

Formula and worked example

Simple payback = investment / (extra monthly contribution − extra running cost)

Example figures
InputExample
Equipment and setup cost15,000
Extra monthly contribution2,000
Extra monthly running costs500
Calculated result10 months

Choose reliable inputs

Plan materials, travel and crew time before committing to a price. For this flooring installation calculation, use a completed job sheet, supplier quotes and a crew schedule and a consistent definition of one flooring job.

  • Floor covering: include the portion belonging to this flooring job or reporting period, and record where the value came from.
  • Preparation: include the portion belonging to this flooring job or reporting period, and record where the value came from.
  • Cutting waste: include the portion belonging to this flooring job or reporting period, and record where the value came from.

Use the same currency for every money input. Do not mix weekly costs with monthly revenue, or count the same expense in both an itemised cost and allocated overhead.

Is simple payback a full investment appraisal?

It only estimates recovery time under constant net benefit. It does not compare all cash flows or investment risk.

Excludes financing, taxes, resale value, and the time value of money.

Compare a different assumption

What if this input changes?

If equipment and setup cost rises by 10%, this example changes by 1 months. This shows the effect of one change; it does not predict what will happen.

Open the calculator, save your baseline, then change the input supported by the least reliable estimate in your records. Compare both scenarios before committing to a price or capacity promise.

More tools and guidance

Find the next calculation
you need.

Browse calculatorsFind your industry
Cobalt ribbon, chrome ring and orange sphere in architectural light

Search AskToBot

Start typing to find a calculator or conversion.