With the illustrative inputs below, the result is 8 packs.
Try this with your own numbersFormula and worked example
Packs = ceiling(net quantity × (1 + waste) / pack quantity)
| Input | Example |
|---|---|
| Net quantity needed | 86 |
| Waste allowance | 10 % |
| Units per supplier pack | 12 |
| Calculated result | 8 packs |
Choose reliable inputs
Separate parts, technician time and bay availability for each repair order. For this fleet maintenance calculation, use repair orders, parts invoices and technician time logs and a consistent definition of one maintenance visit.
- Parts: include the portion belonging to this maintenance visit or reporting period, and record where the value came from.
- Technician hours: include the portion belonging to this maintenance visit or reporting period, and record where the value came from.
- Scheduling overhead: include the portion belonging to this maintenance visit or reporting period, and record where the value came from.
Use the same currency for every money input. Do not mix weekly costs with monthly revenue, or count the same expense in both an itemised cost and allocated overhead.
Should I round before or after the waste allowance?
Apply waste before rounding. The allowance adds to net need; it is not a percentage loss from purchased quantity.
What if this input changes?
If net quantity needed rises by 10%, this example changes by 1 packs. This shows the effect of one change; it does not predict what will happen.
Open the calculator, save your baseline, then change the input supported by the least reliable estimate in your records. Compare both scenarios before committing to a price or capacity promise.
