Menu
Creative & events / Question & answer

Event planning: Can a profitable job still fail my margin target?

Find the discount boundary that still preserves an entered margin.

Cobalt ribbon, chrome ring and orange sphere in architectural light
Event planning / event economics
Answer

Positive profit and the desired percentage margin are different tests. The margin denominator is revenue.

Try this with your own numbers

Formula and worked example

Maximum discount = (1 − cost / ((1 − margin) × current price)) × 100

Example figures
InputExample
Current price1,000
All assigned cost650
Minimum retained margin20 %
Calculated result18.75 %

Choose reliable inputs

Include preparation, delivery and post-production rather than shoot or event time alone. For this event planning calculation, use production schedules, vendor quotes and editing logs and a consistent definition of one event.

  • Coordination hours: include the portion belonging to this event or reporting period, and record where the value came from.
  • Vendors: include the portion belonging to this event or reporting period, and record where the value came from.
  • Travel: include the portion belonging to this event or reporting period, and record where the value came from.

Use the same currency for every money input. Do not mix weekly costs with monthly revenue, or count the same expense in both an itemised cost and allocated overhead.

Can a profitable job still fail my margin target?

Positive profit and the desired percentage margin are different tests. The margin denominator is revenue.

A negative answer means the current price already fails the target margin.

Compare a different assumption

What if this input changes?

If current price rises by 10%, this example changes by 7.3864 %. This shows the effect of one change; it does not predict what will happen.

Open the calculator, save your baseline, then change the input supported by the least reliable estimate in your records. Compare both scenarios before committing to a price or capacity promise.

More tools and guidance

Find the next calculation
you need.

Browse calculatorsFind your industry
Cobalt ribbon, chrome ring and orange sphere in architectural light

Search AskToBot

Start typing to find a calculator or conversion.