With the illustrative inputs below, the result is 50 per qualified lead.
Try this with your own numbersFormula and worked example
Maximum spend per lead = (revenue − delivery cost − retained contribution) × close rate
| Input | Example |
|---|---|
| First-sale revenue | 800 |
| Variable delivery cost | 500 |
| Contribution to retain | 100 |
| Qualified lead close rate | 25 % |
| Calculated result | 50 per qualified lead |
Choose reliable inputs
Plan materials, travel and crew time before committing to a price. For this cabinet installation calculation, use a completed job sheet, supplier quotes and a crew schedule and a consistent definition of one installation.
- Cabinetry: include the portion belonging to this installation or reporting period, and record where the value came from.
- Fitting labour: include the portion belonging to this installation or reporting period, and record where the value came from.
- Site protection: include the portion belonging to this installation or reporting period, and record where the value came from.
Use the same currency for every money input. Do not mix weekly costs with monthly revenue, or count the same expense in both an itemised cost and allocated overhead.
What can I afford to pay for a lead?
A negative ceiling means the required retained contribution already exceeds the sale contribution. Repeat revenue is excluded.
What if this input changes?
If first-sale revenue rises by 10%, this example changes by 20 per qualified lead. This shows the effect of one change; it does not predict what will happen.
Open the calculator, save your baseline, then change the input supported by the least reliable estimate in your records. Compare both scenarios before committing to a price or capacity promise.